Blog
Working Best Under Pressure
Managed pressure cementing or MPC is a cementing solution that Pruitt has used on multiple occasions in problem formations for various U.S. operators. In this brief case study, we will discuss the challenges and solutions for cementing pipe in difficult circumstances. What is managed pressure cementing? ‘Managed Pressure Cementing’ or ‘MPC’ is a cementing solution […]
Freeing differentially stuck drill pipe can be extremely challenging and often leads to non-productive down time unless you have a proven MPD solution. Pruitt engineers design, plan, and execute constant bottomhole pressure managed pressure drilling (CBHP MPD) solutions to lower differential pressure and work pipe to free it. What is differentially stuck drill pipe? Differentially […]
The challenge, especially in North American land drilling business units, is for operators to have engineers or subject matter experts who know and understand how to best manage drilling-related problems such as wellbore stability while drilling, narrow drilling windows, and other drilling-related issues. What is wellbore stability? Wellbore stability is the process of managing the […]
Long before these challenging times set in, Pruitt set out to answer our customers’ request for a more cost-effective and modular #MPD solution without sacrificing capability. Pruitt’s new UltraLite™ MPD system IS that solution. Cost-effective and fully-capable, this system also features remote capabilities which can significantly lower #opex by helping reduce the number of personnel […]